At the Ballard Town Hall meeting somebody asked whether Sound Transit had considered elevating the line instead of tunneling to reduce cost and build it earlier. Sound Transit’s response was that they cannot imagine any way to build an elevated Link light rail line through downtown and meet current environmental requirements. An elevated line would certainly be cheaper and faster to build and easier for riders to access than the currently planned deep tunnel. Could any of the alternative modes I described make it possible to build an elevated line through downtown?

As Kubly/Reed recently pointed out, current Link trains needs very long stations. That makes it difficult to find a location for an underground station which does not interfere with existing building foundations, but also to fit an elevated station into the existing street valleys. For more infrequent lines, the station also has to allow sufficient waiting area requiring wider platforms. As Kubly/Reed pointed out, automated light metro systems allow more frequent but shorter trains which reduces the size of the station area. Link also requires a pole for overhead wires, an emergency and maintenance walkway, and potentially noise barriers along its guideway for a total width of about 29 feet. Link’s maximum turn radius (82 feet) and maximum grade (6%) also create challenges to fit the guideway into downtown. Monorail guideways are visually less bulky but still require a separate emergency walkway. When the Monorail Project suggested running the Green Line through downtown as an elevated line, people were also concerned about their privacy as riders may peek into their windows. Link would require an even wider guideway than the monorail.
Modern guideways such as used by TSB Maglev integrate the emergency walkway into the middle of the track rather than between the two tracks and only require a 20 feet wide guideway. With a center platform, a station requires a width of 50 feet (60′ for Link). To scale Seattle’s hills, grades of up to 10% can be handled. Construction is much faster and less disruptive as the guideway is prefabricated. Once the columns are built, the guideway gets trucked in and placed by crane.
Various elevated alignments have been considered in the past (or should be):
Modern maglev guideway technology may also make it feasible to run along 15th Ave W through Interbay and use precast modules for a station above the road. As such technology also allows for grades up to 10%, it may even allow a bridge over the ship canal. Otherwise a ship canal tunnel would still be required unless Sound Transit would consider a Salmon Bay gondola for now and save even more.
The downtown alignments could also be used to connect with the West Seattle line. The First Hill alignments would create a great alternative if the current downtown tunnel is out of service, with transfers at Westlake and Mt. Baker.
Elevated guideways also make it much easier to add branches (for example to serve Aurora Ave) or add a station later – practically impossible in case of a drilled tunnel.
While an elevated line would be far cheaper, it would probably require a new EIS submission. That would add a few years to the timeline, but because of the lower cost, construction could start immediately once federal approval has been obtained. That may still allow an opening date closer to the 2032 target date than waiting until 2060 and we would not have to burden our grandchildren with paying off a much larger debt.